Production Wells Optimizing In Gassi Touil Field With Water& Gas Shutoff, Sucker Rod Pump And Electrical Submersible Pump
Résumé: This work delves deep into the optimizing of wells in the GASSI TOUIL field, focusing on both eruptive wells GT03, GT30, GT45. we evaluate that GT03 (non-candidate for the gas shutoff operation), GT30 and GT45 have been successful in shutting off the gas, which have improved the oil production rate (GT30 from 54.24 m3/d to161.5 m3/d and GT45 from 7.79 m3/d to 21.58 m3/d), based on PLT data and the evaluation of this data with EMERAUD software. And non-eruptive wells (HC 05 and GT35) through artificial lift techniques: well, HC05 is improved using SRP to optimize the oil flowrate from 10.943 m3/d to 24.048 m3/d, and well GT35 is upgraded with an ESP with modeling done via PIPESIM software to optimize the liquid flowrate from 97.85 m3/d to 170 m3/d.
Mots-clès:
Nos services universitaires et académiques
Thèses-Algérie vous propose ses divers services d’édition: mise en page, révision, correction, traduction, analyse du plagiat, ainsi que la réalisation des supports graphiques et de présentation (Slideshows).
Obtenez dès à présent et en toute facilité votre devis gratuit et une estimation de la durée de réalisation et bénéficiez d'une qualité de travail irréprochable et d'un temps de livraison imbattable!